Documented separation
We map both paths from building entry to building entry and document the separation, with KMZ route files supplied.
Circuit pairs with documented physical separation, and routes that avoid named countries, waters or cable systems. We assess both paths from building entry to building entry and design around known convergence points.
Separation · exclusion routing · KMZWe map both paths from building entry to building entry and document the separation, with KMZ route files supplied.
Routes designed to avoid named countries, territorial waters or subsea cable systems, with route compliance confirmed in writing.
Where paths meet at a shared duct, exchange or crossing, we propose separate building entrances, different serving operators or a short build.
Our engineers design the route end to end, naming the cable systems and border crossings, with KMZ route files supplied with proposals.
Circuits are tested against agreed acceptance criteria, including ITU-T Y.1564, light levels and jitter, with applicable results supplied at handover.
Our 24/7 network operations centre monitors the circuit around the clock and is your single point of contact for faults, reporting and changes.
Applicable contractual, security and supply-chain requirements are incorporated into route design, supplier coordination and service delivery.
One contract and one contact for the whole circuit, from design to daily operation.
Pair any circuit with a physically separate second route for resilience, with the separation documented.
Send us both ends and any countries, waters or cable systems to avoid. We reply with feasible diverse routes, the separation we can document and budgetary pricing.